Cultural Resources Study for the Lake Berryessa Resort Improvement District Ground Water Inflow Mitigation Design Project

Cultural Resources Study for the Lake Berryessa Resort Improvement District Ground Water Inflow Mitigation Design Project

School or Division
Calendar Start & End Date
May 2021 to Dec 2021
Funding Amount
$18,200

The Anthropological Studies Center (ASC) will be conducting a cultural resources study for the Lake Berryessa Resort Improvement District (LBRID) Ground Water Inflow Mitigation Design Project in Napa County. The Napa County Flood Control and Water Conservation District proposes to install a deep trench to intercept groundwater and route it away from the existing treatment ponds, minor grading along an existing road and ditch, and the replacement of the original and existing influent above grade influent piping to the primary ponds in the Area of Potential Effects (APE).